Parcourir le wiki

Energy  +
Published  +
0  +
EUR (€)  +
This is the Sunzilla 3.0 assembly manual wThis is the Sunzilla 3.0 assembly manual with Safety Instructions. This manual explains how to commission and decommission the SunZilla 3.0. and includes imporant safety information. PLEASE DO NOT ATTEMPT TO USE THE SUNZILLA 3.0 UNTIL YOU HAVE READ THIS MANUAL!ZILLA 3.0 UNTIL YOU HAVE READ THIS MANUAL!  +
Easy  +
20  +
minute(s)  +
'''Technical details:''' * Solar peak Power: 140W * Maximum AC-output of pure sinus inverter: 350W (700W peakload) * Effectiv battery storage: 600 Wh  +
en  +
CERN Open Hardware Licence v1.2  +
Sunzilla_Assembly_03.png  +
Get the three boxes : 1. The left one (A) is the battery box 2. The mid- dle one (B) the solar box 3. The right one (C) the socket box Open the solar module box, and get the solar cells, the cables, the aluminium profiles and the 8 screws outside.  +
Press the cable inside when both white points match and turn the blue top unit of the cable to lock.  +, Close the solar module box, put the two long aluminium profiles in their holes. Open slightly the box and insert two screws to lock the profiles. Choose the same holes in the middle and be sure to do the same on both sides.  +, Take the shorter aluminium profiles, insert them as shown on the pic and lock them.  +, Take the solar cells. Unfold them and shift the aluminium edges at all four sides  +, Take the upper part of the solar module and connect the whole solar module with the upper aluminium profile. Be sure that the solar module is on the left side of the aluminium profile. Connect also the lower part.  +, Connect the cables from the solar cells to the solar module box.  +, Switch on battery box. Green light should turn on  +, Switch on socket box. Green light should turn on  +, Switch off Socket Box if switched on  +, Turn Solar Panels out of sun and cover at least one Solar-Panel (for exam- ple with Pullover)  +, Switch on Socket box again until green light is off (to discharge local en- ergy storage), then switch OFF again! YOU’RE DONE!  +  et <div class="icon-instructions caution-i
IMPORTANT!! DANGER!! READ DISMANTLING MANUAL!!
At Dismanteling, you MUST follow the right order of these steps, otherwise you could be hurt.
Dismanteling, you MUST follow the right order of these steps, otherwise you could be hurt.  +
Connect the three boxes  +, Close the solar module box  +, Insert the aluminium profiles  +, Pull down the elastic bands  +, Switch on battery box  +, Switch on socket box  +, Plug in consumer  +, Dismanteling  +, Switch off Socket Box if switched on  +, Turn Solar Panels out of sun  +, Disconnect Solar-Connectors  +, Switch off Battery box  +, Unplug / detach orange cables  +  et Switch on Socket box again  +
Technique  +
Date de modification« Date de modification (Modification date) » est une propriété prédéfinie qui correspond à la date de la dernière modification d’un sujet et est fournie par MédiaWiki Sémantique.
10:59:33, 9 décembre 2019  +
⧼cs-comments⧽Cette propriété est une propriété spéciale dans ce wiki.
0  +
Créateur de la pageCette propriété est une propriété spéciale dans ce wiki.
I did itCette propriété est une propriété spéciale dans ce wiki.
0  +
FavorisCette propriété est une propriété spéciale dans ce wiki.
0  +
 
Aucune propriété ne pointe vers cette page.