Materials
Tools
Step 1 - Tools
Hammer
(punch) for knocking out leftover metal slugs
Files
Mallet
Socket wrench( 2x)
Tape measure
Screwdriver (directing the slide nuts)
Marker
Step 2 - Table Parts
Parts Needed:
Aluminum Extrusion
Profile
Length (mm)
Quantity
8080
520
4
8080
600
4
8080
1200
2
4080
520
1
4080
455
1
data-sheets-value="{"1":2,"2":"Corner Plates"}"
Step 3 - Table Construction - Legs
Tools
XX Socket Wrench
Screwdriver
Parts
4x 8080*600mm
2x 8080*1200mm
4x Side Plates
32x T nuts
32x Washers
32x M8x16mm Bolts
Steps
Lay one 1200mm beam horizontally in your workspace. Add a 600mm beam perpendicular at each end, forming a staple shape. (see image 5 for final shape reference)
Using 8 total washers, slide 2 at a time into each rail at the corner, approximating the hole pattern on the side plates. (image 2)
Using a screwdriver to position the T-nuts, add an M8x16 Bolt and washer through the side plate into each T nut. (images 3 and 4)
Secure with a socket wrench. Repeat on the other side of the 1200mm beam.
You now have a staple shape. Repeat.
Step 4 - Table Construction - Side Joints
Tools
XX Socket Wrench
Screwdriver
Parts
2x 8080*520mm
4x Corner Plates
44x T nuts
32x Washers
32x M8x16mm Bolts
Steps
Stand one leg unit upward, so you can see down the 1200mm section. Slide 4 T-nuts total (2 in each rail) up to the corner joint. (image 2)
SPECIAL STEP: on the 1200mm beam, opposite side from where the side plate was installed - Slide 2 nuts into each of the rails. These will be used in a future step. Repeat on the other 1200mm beam.
Attach the side plate (image 3) using 4 M8x16 Bolts with 4 washers.
NOTE: the 45° side should face the "bottom" of the eventual table.
Repeat on the remaining three 600mm legs.
NOTE: ensure that each corner plate mirrors each other across the 1200mm beam axis. They should be facing the same direction and away from the side plate from the previous step.
Slide 8 total T-nuts into a 520mm beam. They should be split in half, 4 at one end, and 4 at the other. (Image 4)
SPECIAL STEP: On only ONE of the 520mm beams, add 4 T-nuts, 2 in each rail on the opposite side that you used for Step 5.
Combine the two "staple" sections by adding the 520mm beam (pre-loaded with T-nuts) using the same M8x16mm, washer combination as before. (image 5)
Repeat on the other side. (image 6)
You should now have a very solid table base!
Step 5 - Table Construction - Side Braces
Tools
XX Socket Wrench
Screwdriver
Parts
2x 8080*520mm
8x Brackets
16x T nuts
16x Washers
16x M8x20mm Bolts
*A quick note about bracket orientation. In image 2 you will see that the brackets are not the same on both sides. Here we have flipped one, so you can see the difference. One of the holes sits atop a raised lip, while the other is flush. The raised lip hole is closer to the brackets outside edge. The flush hole is farther from the outside edge. This matters for order of operations. When installing, you must install in the flush hole first, and the hole with the raised lip second. If you do it in reverse the bolt will block access to the other hole. :)
Steps
Slide 4 nuts into the 520mm beam (2 in each rail).
Attach the 4 brackets loosely using M8x20mm bolts and washers. (image 3)
Note the orientation of the holes. All 4 bolts should go in flush holes, not raised lip holes. (figure 4)
With the table flipped on its end, position the 520mm beam in place, and slide 2 T-nuts in the rails to meet the brackets. Secure with same M8x20 bolt washer combo.
Repeat this process on the other side of the 520mm beam.
Repeat steps 1-4 on the opposite side of table.
Step 6 - Table Construction - Center Struts
Tools
XX Socket Wrench
Screwdriver
Parts
1x 4080*520mm
1x 4080*455mm
16 Brackets
20x T nuts
32x Washers
32x M8x16mm Bolts
*Construction note: Until the very end, keep ALL of these bolt joints LOOSE. They will need to slide around to get everything in place. Once the location has been set, then you can tighten them down.
Steps
Insert 4 T-nuts (2 in each rail) on one side of the 520mm 4080 (image1 )
For both beams, attach brackets (using the flush hole) at all 8 corners. (image 2)
Arrange the beams so the 520mm beam is vertical, and the 455mm beam is horizontal, intersecting near the middle of the 520mm beam on the left hand side.
Loosely attach the horizontal beam to the vertical beam. (images 3 and 4)
Remember all those T-nuts we hid in the frame in step 4? Now we are going to connect this sub-assembly to them.
Place 4 bolt/washer combos at each of the 3 locations designated in image 5.
Drop the sub-assembly into the table frame, and loosely connect the brackets into the pre-loaded T-nuts
This is easier with 2 people.
You only need 1 bolt at each of the three locations to hold the weight of the sub-assembly.
After those first three bolts are in, you can easily go back and connect the others.
Comments
ennone0Draft
×
Error in page name
You entered an invalid page name, with one or many of the following characters :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #
Log in
You doesn't have an account ? Subscribe to get the best of the plateform !