(Mise à jour pour être en accord avec la nouvelle version de la source de la page) |
(update property name) |
||
Ligne 1 : | Ligne 1 : | ||
− | {{ | + | {{Tuto Details |
|Main_Picture=SolarOSE_G6_2_5.jpg | |Main_Picture=SolarOSE_G6_2_5.jpg | ||
|Licences=Attribution-ShareAlike (CC BY-SA) | |Licences=Attribution-ShareAlike (CC BY-SA) | ||
Ligne 14 : | Ligne 14 : | ||
|IsTranslation=1 | |IsTranslation=1 | ||
}} | }} | ||
− | {{ | + | {{Introduction |
|Introduction= | |Introduction= | ||
}} | }} | ||
− | {{ | + | {{Materials |
|Material= | |Material= | ||
|Tools= | |Tools= | ||
}} | }} | ||
− | {{ | + | {{Separator}} |
− | {{ | + | {{Tuto Step |
|Step_Title=Absorber Tube | |Step_Title=Absorber Tube | ||
|Step_Content=Cut a brass tube with an exterior diameter of 55 mm and a length of 1900 mm. The pipe is originally shiny. | |Step_Content=Cut a brass tube with an exterior diameter of 55 mm and a length of 1900 mm. The pipe is originally shiny. | ||
Ligne 34 : | Ligne 34 : | ||
|Step_Picture_03=SolarOSE_G6_1_4.jpg | |Step_Picture_03=SolarOSE_G6_1_4.jpg | ||
}} | }} | ||
− | {{ | + | {{Tuto Step |
|Step_Title=Elements of hydraulic circuit | |Step_Title=Elements of hydraulic circuit | ||
|Step_Content=Cut the copper pipes: | |Step_Content=Cut the copper pipes: | ||
Ligne 51 : | Ligne 51 : | ||
|Step_Picture_05=SolarOSE_G6_2_4.jpg | |Step_Picture_05=SolarOSE_G6_2_4.jpg | ||
}} | }} | ||
− | {{ | + | {{Notes |
|Notes= | |Notes= | ||
}} | }} | ||
− | {{ | + | {{Tuto Status |
|Complete=Published | |Complete=Published | ||
}} | }} | ||
{{Separator}} | {{Separator}} |
Auteur OSE France | Dernière modification 9/12/2019 par Clementflipo
SolarOSE_G6_2_5.jpg en none Creation 1
Cut a brass tube with an exterior diameter of 55 mm and a length of 1900 mm. The pipe is originally shiny.
Weld the fittings on the edges, according to the photo. Make sure one fitting is at the bottom, and the other one at the top: this enables to feed liquid water from the lower part and extract water vapor from the top.
Once the pipe is welded, you need to darken its external surface, so it becomes as absorptive (black) as possible. This is very important as we want as much solar light to be absorbed on the pipe to heat the water inside. Apply an oxidizing solution suitable for brass (easily available on the market). Let the oxidizing solution dry for a couple of days if possible. Remove the traces of the oxidizing solution with a wet paper. Or just follow the instructions on your oxidizing solution.
Cut the copper pipes: + 3 m length for the water alimentation + 15 cm for the south connection (water) + 15 cm for the north connection (steam)
Arrange the connection to the edges of the tubes, as seen on the schema/photos of the hydraulic circuit.
The plumbing complementary elements depend on the application connected to the solar boiler.
Published
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #