*The following X steps will be used to make 2 identical plate assemblies. The parts listed are for 1 assembly (so double everything if you're making two plates at a time)
Tools
1/4"-20 tap + tap handle
countersink (or anything over 1/4" bit) for hole cleanup
1/2" Socket
Parts
1 meter aluminum sheet
2x 1000mm 2040 extrusion
4x 960mm 2040 extrusion
4x 286mm 2040 extrusion
2x266mm 2040 extrusion
156 T-nuts (16*9) + 12)
156 M8x16mm Bolts
Steps
Tap the 36 pre-drilled 13/64" holes with the 1/4"-20 tap.
use the countersink bit to clean up any debris.
Layout the large extrusion (image 2) so that the 1m sides are parallel, and the 960mm beams are evenly distributed at 90 degrees to the 1m beams.
Insert 12 t-nuts (6 in each row) into each extrusion face that faces the inside of the plate. (image 2). 8 faces total(4 from exterior beams, and 4 from each side of the two interior beams. 96 nuts total
Position the two 266mm beams in the center row, splitting it into 3 equal sections.
Position the four 286mm beams in the top and bottom rows, matching the position of the 266 beams.
For each 40mm face of these interior beams, place 4 t nuts (2 in each slot). Be sure to place these on both faces. 48 nuts total.
Attaching the exterior beams to the plate
On the bottom 20mm face, slide 4 t nuts into each 1000mm beam. (image 4)
Match these T nuts with the holes in the plate as this will be a "blind" install. (image 5)
slide the plate off your work area so you can access the holes from below.
Place the extrusion directly on top of the plate ensuring not to shift it off its alignment.
Using the M8 bolts, secure the beam to the plate.
Repeat this process until you have attached both 1000mm beams and 960mm beams. (12 bolts total)
Comments
ennone0Draft
×
Error in page name
You entered an invalid page name, with one or many of the following characters :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #
Log in
You doesn't have an account ? Subscribe to get the best of the plateform !